Padel Court Installation

Getting a padel court onto your site, step by step: how we do it, what we need from you, and how long each stage takes.

How a Padel Court Installation Runs

The concrete base is prepared locally, before the court arrives. It is a separate local cost and the one stage that has to be right, because everything else sits on it. We send your builder the drawings.

Site check

You send dimensions and photos, we confirm the court fits

Base

The concrete slab, prepared locally to the drawings we send

Production & shipping

Averages 30 to 60 days

Installation

3 to 6 days per court on site

Handover

We check structure, glass and playing surface with you

What Gets Installed

Padel court steel frame, wire mesh and tempered glass installed by Dream Courts in Bali
Playing area
Standard 20 × 10 m — confirm your footprint with our team
Turf
100% PE monofilament, KDK curly diamond fibre, 12mm pile, 10,000 dtex
Metal structure
Hot-dip galvanised 3mm steel (Q235B), electrostatic oven-cured powder coating
Wire mesh
Hot-dip galvanised electro-welded 4mm, 50 × 50 mm
Tempered glass
12mm, CE / SGCC certified, 2×3 m panels (18 pcs)
Padel net
Long service life, customisable
LED lighting
8×200W or 4×480W, 200–800 lux, IP66, CE / ROHS
Standard
FIP compliant, ready for club competition

Working With Contractors and Distributors

We install for clubs, hotels and resorts, sports contractors and distributors, from Australia to South-East Asia. Building courts for someone else? We support your crew on site.

Your Crew or Ours

Our team can assemble the court, or we supply the drawings and support your crew through the build. Your client stays your client.

Proven in 30+ Countries

Installations from South-East Asia to Mexico, Cyprus, the Philippines, Indonesia and the Netherlands.

Common Questions

Padel Court Installation — Common Questions

Once the court base is ready, on-site installation takes 3 to 6 days per court, depending on the site conditions.

Either. Our team can assemble the court, or we support your crew through the build.

Yes. Capas Padel, our official US distributor, installs the court on site once the court base is ready. See padel courts in the United States.

The concrete base, prepared to the drawings we send you. Everything else comes with the court.

Delivery averages 30 to 60 days. Once the court base is ready, on-site installation takes 3 to 6 days per court, depending on the site conditions.

Tell us what you have and we will look at it with you.

Next Step

Send Us Your Site Dimensions

Send us your site dimensions and we will tell you what your installation involves. Adding a roof? Ask about a custom padel court canopy when you get in touch. Need extras? See our padel court equipment.

Scroll to Top
Dream Courts
Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.