Getting a padel court onto your site is the part most suppliers gloss over. This is how we do it, what we need from you, and how long each stage takes.
FIP-Compliant
30+ Countries Installed
Your Crew or Ours

The Install
How a Padel Court Installation Runs
We install for clubs, hotels and resorts, sports contractors and distributors. If you are building courts for someone else, we work behind you and support your crew on site.
Every court we install is FIP-compliant and built to comply with the UNE 147201:2024 standard, from the DC-CLUB to the full-panoramic DC-TORNEO. Explore our full padel court range. Adding a roof? We also build custom canopies.
Installing in Australia or South-East Asia? See padel courts in Australia · padel courts in South-East Asia.
- Site check — you send dimensions and photos, we confirm the court fits
- Base — the concrete slab, prepared locally to the drawings we send
- Production & shipping — averages 30–60 days depending on international shipping transit
- Installation — 3 to 6 days per court on site
- Handover — we check structure, glass and playing surface with you
3 Models
Courts We Install

DC-CLUB — Classic Court
The classic, most economical court — easy to install and maintain, built to last. Same high-density turf, galvanised steel and CE/SGCC glass as the panoramic range. Best for first-time builds and multi-court roll-outs. Request a quote.

DC-VISTA — Panoramic Court · Most Popular
Our best-selling panoramic padel court — great value-for-money, with panoramic side glass for great spectator visibility. 12mm CE/SGCC tempered glass on a hot-dip galvanised frame.

DC-TORNEO — Full Panoramic Court
Our most advanced court: full panoramic design with maximum visibility from all sides, engineered to tournament / international level. For flagship venues, official events and centre courts. Request a quote.
All FIP-Compliant
What Gets Installed
Playing area
Standard 20 × 10 m — confirm your footprint with our team
Turf
100% PE monofilament, KDK curly diamond fibre, 12mm pile, 10,000 dtex
Metal structure
Hot-dip galvanised 3mm steel (Q235B), electrostatic oven-cured powder coating
Wire mesh
Hot-dip galvanised electro-welded 4mm, 50 × 50 mm
Tempered glass
12mm, CE / SGCC certified, 2×3 m panels (18 pcs)
Padel net
FIP compliant, long service life, customisable
LED lighting
8×200W or 4×480W, 200–800 lux, IP66, CE / ROHS
Standard
FIP compliant, ready for club competition
Contractors & Distributors
Working With Contractors and Distributors
Your Crew or Ours
Our team can assemble the court, or we supply the drawings and support your crew through the build. Your client stays your client.
FIP-Compliant, Every Model
Competition-ready and FIP-compliant, out of the box.
Proven in 30+ Countries
Installations from South-East Asia to Mexico, Cyprus, the Philippines, Indonesia, the Netherlands and beyond. From 2026 we also deliver to Australia.
3 to 6 Days on Site
Once the court has been delivered, installation takes 3 to 6 days per court, depending on the country and site conditions.
Before Delivery
What You Need Ready on Site
The concrete base is prepared locally, before the court arrives. It is a separate local cost and it is the one stage that has to be right, because everything else sits on it. We send your builder the drawings. Wondering about budget? See what drives the investment on our padel court cost guide.
- Send us your site dimensions and photos
- We confirm the footprint and send the base drawings
- Your builder prepares the slab while the court is produced
- We install on site, then hand over with you

Common Questions
Padel Court Installation — Common Questions
Next Step
Send Us Your Site Dimensions
Send us your site dimensions and we will tell you what your installation involves. Adding a roof? Ask about a custom padel court canopy when you get in touch.